Forum

lufft101
 
lufft101
lufft101
Group: Registered
Joined: 2020/02/17
New Member

About Me

Introduction
The CT can be mounted on an existing panel, such as a control center or load center, to measure or monitor wattage. These CTs can be installed without disassembling existing cables for easy installation.
Advantage
Easy to install.
Excellent linearity over the entire range.
Fully compliant with RoHS standards.
Application
Current measurement
Monitoring and protection
Energy and sub-metering products
Network equipment
Instruments and sensors
Control System
Our Company
Founded in Wuxi, Jiangsu, Leo has nearly 10 years of experience in designing and manufacturing transformers and coil assemblies. High quality, low cost and best service are our most sought after! At the same time, it has also obtained ISO 9001 certification.
FAQ
1.Q:Where is your factory located?
A:Our factory address is Zhuqing Village Industrial Park Gangxia Town, Xishan District, Wuxi, Jiangsu, China.
2.Q:What is your minimum order quantity?
A:Our minimum quantity is 50 pc.
3.Q:What is the delivery time of your products?
A:In general, the delivery time of our products is about10-15 days.Electricity Meter Current Transformer
website:http://www.ctsensorducer.com/electricity-meter-current-transformer/

Social Networks
Member Activity
0
Forum Posts
0
Topics
0
Questions
0
Answers
0
Question Comments
0
Liked
0
Received Likes
0/10
Rating
0
Blog Posts
0
Blog Comments
Share: